1Z0-1066-21 Exam Dumps, 1Z0-1066-21 Practice Test Questions [Q44-Q61]

Share

1Z0-1066-21 Exam Dumps, 1Z0-1066-21 Practice Test Questions

PDF (New 2022) Actual Oracle 1Z0-1066-21 Exam Questions

NEW QUESTION 44
During the FIFO pegging process, what is the correct order in which the supplies are sorted?

  • A. Pegging process sorts demands by due dates followed by reservation status
  • B. Pegging process does not respect reservation, and demands are sorted based on due dates
  • C. Peg unreserved demands first and then demands with reservations
  • D. Peg demands with reservationsfirst and then peg demands that do not have reservations
  • E. Pegging process does not respect reservation, and demands are sorted based on demand and supply types

Answer: D

 

NEW QUESTION 45
You are defining material planners for your organization. However, when you go to Manage Material Planners, your organization does not appear in the list of values. Why?

  • A. The organization is an Item Organization.
  • B. The organization was not enabled for collection under ManagePlanning Source Systems.
  • C. The organization must be enabled in Manage Planning Profile Options.
  • D. You do not have data access to theorganization.
  • E. The organization must be enabled in Manage Planning Parameters.

Answer: B

 

NEW QUESTION 46
You analyzed your customer's shipment history data at item and organization level. You found that the customer has many new products withlimited history.
Does Planning Central support forecasting products with limited history, and what is this process called?

  • A. No, Planning Central does not support the Holt Exponential Smoothing forecasting method.
  • B. No, Planning Central does not support the Regression for Sparse Demand forecasting method.
  • C. No, Planning Central does not support the Croston Method for Sparse Demand forecasting method.
  • D. Yes, Planning Central supports the Holt Exponential Smoothing forecasting method used for newly introduced products.
  • E. Yes, Planning Central supportsthe Regression for Sparse Demand forecasting method, typically used for new products.

Answer: D

 

NEW QUESTION 47
Which statement applies only to the planning of back-to-back items and not standard items?

  • A. Must use Global Order Promising and Supply Chain Orchestration to release and create new supplies
  • B. Planning collects bookings or shipments history to forecast items.
  • C. Planning analyzes supply shortages and capacity overloads using any of the standard planning tools.
  • D. Must have added sourcing rules to the Global OrderPromising assignment set.
  • E. Planning pegs reserved supplies to sales orders.

Answer: A

Explanation:

 

NEW QUESTION 48
Your client wants to utilize product categories on sourcing rules. They have created a new categoryfor this and populated the items for it.
Where do they set up the category planning uses when evaluating sourcing rules?

  • A. Manage Planning Source Systems
  • B. Manage Sourcing Rules
  • C. Manage Assignment Sets
  • D. Manage Plans
  • E. Manage Planning Profile Options

Answer: C

 

NEW QUESTION 49
Your clients want to simulate how canceling demand may impact a plan. Which two steps must be done to simulate this change? (Choose two.)

  • A. Open plan > View Supplies and Demands > Firm the demand and set firm quantity to 0 > Save changes
  • B. Run plan with 'Do notrefresh with current data'
  • C. Open plan > View Supplies and Demands > Remove the sales order fromthe plan and firm demand > Save changes
  • D. Manage Plans > Edit Plan Options > Add simulation set
  • E. Run plan with 'Refresh with current data'

Answer: A,B

 

NEW QUESTION 50
Which four actions does DemandManagement enable you to do? (Choose four.)

  • A. Simulate changes to the dependent options forecast for build to stock items.
  • B. Simulate how changes to forecasting models and parameters have an immediate impacton the statistical forecast.
  • C. Run an unlimited number of forecast simulations to see impacts of changes in the price, running a marketing campaign, shift in weather, demand upside request, and so on.
  • D. Perform side-by-side analysis on a multiple number of scenarios, and see the impact on operational and financial objectives.
  • E. Simulate the impact of introducing new products in particular geographic areas.

Answer: B,C,E

 

NEW QUESTION 51
How can you deliver a forecast for drop shipments?

  • A. It cannot be done at this time.
  • B. Create based on the supplier performance for drop shipment collection
  • C. Excel upload using File Based Data Import Process
  • D. Create based on the drop shipment or booking history; the ship from will be the drop ship validation organization
  • E. Generate manually using PlanningAnalytics

Answer: D

 

NEW QUESTION 52
Your client has made a change to item costs. What type of collection do they need to run to only pick up this change?

  • A. Run net change collection for item costs.
  • B. Item costs cannot be updated via a data collection processes.
  • C. Must run full datacollection. It is not possible to update just item costs.
  • D. Run targeted collection for item costs.
  • E. Item costs is automatically updated. No data collection is necessary.

Answer: D

 

NEW QUESTION 53
A customer would like to account for the production loss in the supply planning process using the item shrinkage rate planning specification.
Which statement reflects the system behavior to meet this requirement?

  • A. Planning calculation does not support shrinkage functionality.
  • B. Planning calculates no additional demand but creates the additional required supply based on shrinkage factor.
  • C. Planning calculation creates scrap demand to compensate for loss and maintains supply.
  • D. Planning process reduces the demand based on shrinkage factor and keeps the supply quantity as is.

Answer: C

 

NEW QUESTION 54
You want to check how many items have excess inventory. Where must you go in PlanningCentral to find this information?

  • A. Manage Plans > Edit Supply Plan > Select Supply tab > Navigate to Item area > Filter by Items with Excess Inventory
  • B. Open Table, Graph, or Tile Set > Search Exceptions > Open > Expand Supply Planning Exceptions > Select Item with Excess Inventory
  • C. Configure Exceptions > Expand Supply Planning Exceptions > Select Item With Excess Inventory
  • D. Manage Plans > Edit Demand and Supply Plan > Select Supply tab > Navigate to Item area > Filter by Items with Excess Inventory
  • E. Configure Exceptions > Expand Demand Planning Exceptions > Select Item With Excess Inventory

Answer: B

Explanation:

 

NEW QUESTION 55
Your Procurement Department is getting readyto set up Approved Supplier Lists that will be needed for Supply Planning. They ask you for what you need on the ASLs for planning usage. Which three options are key for planning? (Choose three.)

  • A. Make sure to include Fixed Order Quantities.
  • B. Make sure all Local level ASLs include an Organization.
  • C. Make sure to include Fixed Lot Multipliers.
  • D. Make sure to include Minimum Order Quantities.
  • E. Make sure to include Maximum Order Quantities.
  • F. Make sure they are at a Global level.

Answer: C,D,F

 

NEW QUESTION 56
Which is the proper fulfillment strategy to plan for supply using the appropriate lead times required for processing material at a third party, based on the manufacturing work definition?

  • A. back-to-back orders
  • B. expense destination transfers
  • C. drop shipments
  • D. outside processing operations
  • E. contract manufacturing

Answer: D

 

NEW QUESTION 57
You ran a demand plan and you are reviewing the shipments forecast value measure. It is always zero for a particular item. Identify the root cause of this problem.

  • A. In planning measures catalog, shipment forecast measure is not enabled at item and organization level.
  • B. In plan parameters, Item List Price marked as primary does not have price defined for the particular item.
  • C. In plan parameters, shipment forecast value measure expression is not defined.
  • D. In planning measures catalog, shipment forecast value measure is not enabled at item and organization level.

Answer: D

 

NEW QUESTION 58
On the plan page layout that you created, you have several graphs showing the status of the plans and the business. You see a concern in an area and you want to see the data behind it. What navigation should you use to see this data?

  • A. You cannot see it on the plan outputs, so you need to go into Planning Analytics and re-search the data.
  • B. You cannot see it on the plan outputs, and you will need to create a new table with the information.
  • C. Go toActions > View Data on the graph in question.
  • D. You cannot see it from the plan landing page, and you will need to search for the data.
  • E. On the table in question, go to View > Show table.

Answer: D

 

NEW QUESTION 59
Which four types of supplies can be reserved to a sales order in the inventory? (Choose four.)

  • A. Purchase orders
  • B. On-hand inventory
  • C. Work orders
  • D. Transfer orders
  • E. Purchase requisitions
  • F. Planned Orders

Answer: A,B,C,D

 

NEW QUESTION 60
Should value in Adjusted Shipments Forecast measure always be equal to the Final Shipments Forecast measure?

  • A. No, both measures will always be different.
  • B. Yes,if the demand plan is approved and values are locked.
  • C. Yes,if the adjustment is made at the same aggregation level at which itis viewed, or below.
  • D. Yes, if the adjustment is made below the aggregation level at which it is viewed.
  • E. Yes,if the demand plan hasn't been run again after adjustment.

Answer: C

 

NEW QUESTION 61
......


Oracle 1Z0-1066-21 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Configure Attribute-Based Planning
  • Applying Forecasting Methods, Causal Factors, and then Evaluating Results
Topic 2
  • Deploying Multi-Dimensional Demand Segments
  • Describe Override Demand Forecast and Plan Approval
Topic 3
  • Integrate S&OP with SCM Cloud and External systems
  • Costing and Inventory Foundations
Topic 4
  • Configuring UOM, Currency, Disaggregation and Conditional Formatting
  • Configuring Pages, Tile sets, Tables and Graphs
Topic 5
  • Manage Release Recommendations
  • Evaluate and Execute Simulations
  • Contract Management Collaboration
Topic 6
  • Inventory rebalancing via clustering
  • Modelling and Analyzing the Supply Plan
  • Explain Simulate Forecast Scenarios
Topic 7
  • Configure Safety Stock Plan options
  • Configure Replenishment Planning
Topic 8
  • Create and Manage a Constrained Supply Plan, including Material and Resource Constraints
  • Configure, Run and Manage a Demand Plan

 

Updated Mar-2022 Pass 1Z0-1066-21 Exam - Real Practice Test Questions: https://validtorrent.prep4pass.com/1Z0-1066-21_exam-braindumps.html